Then the husband and wife team of Sam and Sherry went to work on the interior. In 104 degree temps (with humidity factored in, it felt hotter 'n' hell) we installed plywood to the lower part of the interior to protect the surface of the insulation covering and to have a wall to hang stuff on. Sam did the majority of the work while Sherry wimped out in the house under the a/c.
The compound miter saw was borrowed from Elton.
Hi Y'all!!
5 years ago
Doing a check. ;o)
ReplyDelete